Free cost segregation, 179D and R&D analysis. No obligation, and I'll tell you if a study won't pay for itself.

Section 168(n) Could Save Your Plant Millions #taxstrategy #manufacturing #realestate

The One Big Beautiful Bill Act created a new deduction for manufacturers in Section 168(n), qualified production property. It lets you deduct the production portion of a new factory building in year one. Only the production portion counts, so somebody has to measure the building and split it by use.

Here is what that split can mean, as an illustration built to show the mechanics. A manufacturer builds a $10 million plant, land left out, and a measured allocation shows 70 percent of it as production space. That is $7 million of qualified production property. With the 168(n) election, the full $7 million is deductible the first year. Without it, the same $7 million sits on a 39-year schedule, roughly $180,000 a year. That is the size of the decision, and it is why the allocation has to be done correctly. The window for construction to begin closes at the end of 2028.

From The Tax Strategy Playbook.

Full episode: https://taxstrategyplaybook.com

No-cost analysis through CSSI: https://calendly.com/david-wiener/cs or 770-224-8504 x2

David's website: https://davidhwiener.com

This is educational content, not tax advice for your situation. Talk to your tax professional.

Send a voicemail or question